Contact: the 5th Branch, First Engineering Branch Office
Phone: (03)471-8308
Traffic News:Nightly Closure of Freeway 1 Northbound Zhongli Intermediate Transfer On-ramp
Zhongli Distric, Taoyuan City – The First Engineering Branch Office has announced the scheduled nightly closure of the northbound elevated viaduct lanes on Freeway1, between the Zhongli Intermediate Transfer On-Ramp and the Airport System Interchange, for crews to remove the old traffic signs steel frame and to set up a new. The closure will be in effect from Tuesday, September 9, through Thursday, September 11, 2025, nightly between 10:00 p.m. and 6:00 a.m. the following morning. This closure is necessary to ensure construction safety and improve overall traffic conditions.
Motorists traveling northbound on the Freeway 1 Xizhi–Yangmei Elevated Road toward Taoyuan International Airport and Taipei are reminded to merge left and use the ground-level lanes to reach their destinations.
Detour Information – Traffic control measures will be implemented, and a detour map is provided (see attached diagram). Vehicles heading to the northbound Airport System Interchange via the elevated viaduct should detour to the ground-level Freeway 1 through the Zhongli Intermediate Transfer Connection.
Drivers are advised to expect delays and to consider alternate routes. All construction schedules are subject to change due to weather or construction related issues. For detailed information updates, please visit https://www.freeway.gov.tw/.
 |