交通部高速公路局第一新建工程分局

最新消息

Nightly Closure of Westbound Off-Ramp and Eastbound On-Ramp from Southbound Highway 31 at Dazhu Interchange on Freeway 2 Aug. 17-27


Dazhu District, Taoyuan City – The First Engineering Branch Office of the Freeway Bureau announced that the westbound exit ramp at Dazhu Interchange on Freeway 2 toward Qingpu and the eastbound entrance ramp from southbound Highway 31 to Freeway 2 will be closed nightly from 10:00 p.m. to 6:00 a.m. the following morning, Aug. 17–27 (Monday to Thursday), excluding weekends and holidays, for construction.
The closures are part of the Freeway 2 Dazhu Interchange Improvement Project, which includes widening the westbound exit ramp bridge toward Qingpu. Construction crews will install bridge diaphragm girders and place concrete for the bridge deck during the closure period, according to the construction crew.
While the work is underway, the eastbound outside lane and outside shoulder of Freeway 2 will also be subject to traffic control near the construction area. The two inside lanes will remain open. Motorists are advised to follow traffic control personnel and roadway signs.
Detour Information & Suggested Routes- detour map is attached.
1. For vehicles traveling southbound on Highway 31 intending to enter eastbound Freeway 2: Continue toward Qingpu on Highway 31 and make a U-turn at the Wufu Road intersection. Then enter Freeway 2 via the northbound Highway 31 eastbound entrance ramp.
2. Westbound Freeway 2 toward Qingpu: After exiting at Dazhu Interchange, keep right and follow the ramp toward Luzhu. Continue to Highway 31, make a U-turn at Dazhubei Road, and proceed toward Qingpu on Highway 31.
Traffic Advisory
Motorists are advised to anticipate delays and to use alternate routes whenever possible and best to complete their trips before 10 pm to avoid the traffic closure. All construction schedules may be subjected due to weather conditions or other unforeseen circumstances.
The First Engineering Branch Office appreciates the public’s patience and cooperation during the construction period and apologizes for any inconvenience caused. Motorists are encouraged to check traffic information in advance and follow the designated detour routes to help ensure a safe and efficient journey.
For more information, please visit the Freeway Bureau’s website: https://www.freeway.gov.tw/
I211S-RampFandE_E.JPG
上架日期    :115-08-11
資料維護單位  :第一新建工程分局技術科
本頁最後更新日期:115-08-11
本頁點閱瀏覽次數:35

網站更新日期:115-08-11
瀏覽總數:217268

服務專線:(02)8970-6277(總機)|  網站隱私權政策
地址:238014新北市樹林區佳園路3段101巷3號
廉政檢舉專線 法務部廉政署:0800-286-586 一分局政風室:(02)89703726 檢舉信箱:feoeth@freeway.gov.tw
交通部高速公路局第一新建工程分局 版權所有
Copyright © 2026 Freeway Bureau,Ministry of Transportation and Communications All rights reserved.

 

通過AA無障礙網頁檢測