交通部高速公路局第一新建工程分局

最新消息

Scheduled Closures on Freeway 1 Northbound Outer Lane and the off-ramp left shoulder connected to Highway 64 at Wugu Interchange


Wugu District, New Taipei City – The First Engineering Branch Office announced there will be a long-term closure of the northbound outer lane of Freeway 1, between kilometer station 33k+460 and 33k+050 (approximately 400 meters), as well as the left shoulder of the off-ramp connecting to Highway 64 at Wugu Interchange. These closures are required for ongoing adjustments to the mainline and ramp lanes. All other lanes will remain open to traffic.
Motorists should anticipate delays and are strongly advised to plane ahead or use alternate routes. Please note that the construction schedule may be adjusted depending on weather conditions or on-site circumstances.
The First Engineering Branch Office remind drivers traveling with caution when approaching the Wugu Interchange, and follow traffic signs and on-site personnel instructions to ensure safety.
For more information, please visit: https://www.freeway.gov.tw/.
2025-10-01-I103S標五股北主33k050-460外1及北出內路肩長期封閉E.JPG
上架日期    :114-09-26
資料維護單位  :第一新建工程分局技術科
本頁最後更新日期:114-09-26
本頁點閱瀏覽次數:79

網站更新日期:114-09-26

服務專線:(02)8970-6277(總機)|  網站隱私權政策
地址:238014新北市樹林區佳園路3段101巷3號
廉政檢舉專線 法務部廉政署:0800-286-586 一分局政風室:(02)89703726 檢舉信箱:feoeth@freeway.gov.tw
交通部高速公路局全球資訊網 版權所有
Copyright © 2018 Freeway Bureau,Ministry of Transportation and Communications All rights reserved.

 

通過AA無障礙網頁檢測