Freeway 1 scheduled closures for northbound outer lane and the off-ramp left shoulder connected to 台64 in Wugu interchange
Contact: the 3th Branch, First Engineering Branch Office
Phone: (02)2608-6619
Traffic News:Freeway 1 scheduled closures for northbound outer lane and the off-ramp left shoulder connected to 台64 in Wugu interchange
Wugu District, New Taipei City – The First Engineering Branch Office will begin a long term closure the northbound Freeway 1 outer lane between kilometer station 33k+460 and 33k+050, that’s about 400m long, and the off-ramp connected to Highway 台64 left hand side shoulder at Wugu Interchange for the ongoing main traffic lanes and off-ramp lane adjustment work. Beside, the other traffic lanes will remain open.
Motorists should expect delays and are strongly advised to use alternate routes. The work is subject to change due to weather or construction related issues.
The First Engineering Branch Office remind drivers to approach the Wugu Interchange area with care, slow down, stay alert and follow the instructions of the traffic sign or the traffic controller to ensure safe drive. Detailed information is also provided by website https://www.freeway.gov.tw/.

Date of Posting :2025-07-11
Source of Information:FEO,FB
Last Updated:2025-07-11
Visitor Counts:122