跳到主要內容
:::
回首頁
網站導覽
局長信箱
常見問答
English
電子報訂閱
/
取消
RSS
熱門:
高乘載
1968即時路況
ETC電子收費
搜尋
進階搜尋
您的瀏覽器不支援javascript 之Google 搜尋
Abutment,Accelerating Lane,Access Road,Access Switch Router,Accident Severity,Accident Casualty,Accident Rate,Accident-Prone Location,Act For Promotion Of Private Participation In Infrastructure Projects,Add Drop Multiplexer ,Addenda,Advancing Shoring Method,Aggregate,Ahead,Air Pollution,Air Pollution Monitor,Alarm Controller,All Casing Drill Piles,Alternate,Alternative Plant Material,Aluminium,American Association Of State Highway And Transportation Officials,American Society For Testing And Materials,American Welding Society,And,Antitranspirant,Approach Road,Approximate,Arbor,Arch Bridge,Asphalt,Asphalt Concrete,Automatic Vehicle Identification,Auxiliary Lane,Average,Azimuth,Back,Back Up,Balanced Cantilever Method,Basal Dressing,Base,Bearing,Bearing,Bedding Plant,Begin Of Vertical Curve,Beginning,Beginning Of Bridge,Bench Mark,Beneficial Occupancy,Best Applicant,Binder,Bitumen(Asphalt),Bituminous Treated Base,Boring Hole,Borrow,Bottom,Bridge,Bridge Deck,Bridge Length,Bridge Roadway Width,Building Sensor,Cable,Cable Tray,Cable-Stayed Bridge,Caisson Foundation,California Bearing Ratio,California Bearing Ratio Value,Cap Beam,Catch Basin,Cctv Central Controller,Cement Mortar,Cement-Treated Base,Center To Center,Centerline,Central Angle,Central Lane,Changeable Message Sign,Changeable Speed Limit Sign,Channel Bank,Charges And Fees Act,Chemical Admixture,Chemicals,Chinese National Standards,Clearance,Climbing Lane,Closed Circuit Television Coder/Decoder,Closed Circuit Television Detail Monitor,Closed Circuit Television Monitor,Closed Circuit Television Monitor Wall,Closed Circuit Television Work Station,Collector Road/Access Road,Collector-Distributor Road,Collector-Distributor Road,Concrete,Concrete Grouted Rock,Constructional Equipment,Consumers Information,Container,Contract,Contract Change Order,Contract Item; Pay Item,Contract Total Cost,Contract Unit Price,Contraction Joint,Contractor,Control Of Disease And Pest,Core Switch Router,Cross Connection,Cross Road,Cultivation,Culvert,Dangerous Goods,Data Gathering Processor,Datum Line,Day Work,Decelerating Lane,Deflection Angle,Demodulator,Dense Grade Asphalt Concrete,Detour,Dgp-Multiplexer,Diameter,Diameter (Inside),Difference, Drainage,Digital Clock,Digital Loop Carrier,Digital Video Recorder,Dilution,Disk,Drainage,Drainage Facilities,Drawing,Drawings; Contract Drawings,Ds1 Digital Distribution Pannel,Ds3 Digital Distribution Pannel,E1 Multiplexer,E1 Optical Line Terminal Equipment,Each,Each,Each Face,Each Way,East Coordinate,Ecological Revegetation,Edge Meet,Edge Of Pavement,Electronic Toll Collection,Electronic Toll Collection,Electronic Toll Collection And Transportation Management,Electronic/Optical Converter,Elevation,Embankment,Emergency Telephone,Emergency Telephone Test Unit,End Of Vertical Curve,End Wall,Engineer,Engineer''S Representative,Equal,Equal Space,Erosion Control,Etc Utilization Rate,Eupatorium Odoratum,Existing,Expansion,Expansion Joint,Expressway,Expressway,External Distance From Pi To Center Of Circular Curve Arc,Extradosed Bridge,Far Face,Fertilization,Fertilizer,Fiber Distribution Panel,Field Path,Field Path,Filter,Finished,Flange,Flashing Amber,Fog Sign,Fog Warning Light,Freeway And Expressway Traffic Regulation,Freeway Toll ,Friendly Guide Sign,Full Superelevation,Fully Integrated Work Station,Galvanized,Galvanized Iron Pipe,Gantry,Gas Station Customers Service Line,General Provisions,Geographic Information System,Germination Rate,Gps Clock Generator,Grade Separation,Grade, Grade Difference,Greenery Land,Ground Cover,Ground Line,Habitat Fragmentation,Haul Road,Height,Herb,Herbicides,High Occupancy Vehicle,High Tensile Strand,High Water Level,Highway,Highway Act ,Horizontal,Host Computer,Host Computer Console,Hsuehshan Tunnel ,Hub,Image Copy Machine,Image Incident Detector,Image Processor,Impervious Layer,Incremental Launching Method,Independent Verification And Validation,Inner Lane,Inner-Central Lane,Inside Diameter,Inside Face,Inside Layer,Inspector,Intelligent Transportation System,Intertillage,Invasive,Invert Elevation,Irrigation,Joint,Junction Box,Keyboard,Kiosk Query Computer,Labor,Lan Management Work Station,Lan Switch,Landscape,Landslip,Lane Control Signal,Larval Food Plant,Lead Rubber Bearing,Lean Concrete Base Course,Left,Length,Length Of Circular Curve,Length Of Spiral,Length Of Vertical Curve,Leucaena Leucocephala,Linear Meter,Liquid Crystal Display Television,Loam,Local Road,Long Tangent (Spiral),Loop,Lump Sum,Lump Sum,Main Line Barrier Type ,Main Distribution Frame,Main Tunnel,Maintenance,Maintenance Work Station,Makino''S Bamboo,Manhole,Map Display,Materials,Materials Supplied By Owner,Maximum,Median,Median,Median Inlet,Metric Ton,Micro-Pile,Middle Ordinate Of Vertical Curve,Mikania Micrantha,Minimum,Modem,Modulator,Monitor Control Panel,Movable Scaffolding System,Mowing,Mulch,Multi Lane Free Flow,Multi-Bridge,Multi-Function Control Computer,Multi-Function Control Computer Console,Multi-Mode Optical Fiber,Multiple Network Bridge Router,Multiplexer,Native Plant,Natural Vegetation,Near Face,Nectar Plant,Network Management Unit,Network Management Work Station,Normal Crown,North Coordinate,Not In Contract,Not To Scale,Number Of Iron Wire,Off-Ramp,On Board Unit,On-Ramp,Open Graded Asphalt Concrete,Opening Of Road Shoulders,Optical Switch,Optical Time Domain Reflectometry,Optical/Electronic Converter,Or Equal,Organic Matter,Original Ground Line,Outer-Central Lane,Outside Diameter,Outside Lane,Overcrossing,Owner Or Employer,Parameter Of Clothoid,Pavement,Pavement,Pavement Marker (Reflectorized),Pavement Structure,Permanent Plant,Permanent Works,Pervious Layer,Pesticide,Pier,Pile Bent,Pile Cap,Pile Foundation,Pilot Tunnel,Plain Cement Concrete,Plant Disease,Plant Pest,Plasticity Index,Plate,Point Of Change From Circular Curve To Spiral,Point Of Change From Spiral To Circular Curve,Point Of Change From Spiral To Tangent , Short Tangent (Spiral),Point Of Change From Tangent To Spiral,Point Of Compound Curve,Point Of Intersection Of Tangents,Point Of Reversed Curve,Point Of Vertical Intersection,Police Station Computer,Pot Bearing,Precast And Prestressed Concrete I Girder,Precast Segmental Method ,Prestressed Concrete,Prestressed Concrete Box,Prestressed Concrete Pile,Prime Coat,Printer & Printer Server,Private Automatic Branch Exchange,Processing,Profile Grade,Profile Grade Line,Profile Grade Line,Project Server,Prune,Public Address System,Radius Of Curvature,Rain Detector,Ramp Metering,Rapid Ecological Assessment,Red Imported Fire Ant(Rifa),Regulations Governing Collection Of Highway Tolls,Reinforced Concrete,Reinforced Concrete Box,Reinforced Concrete Pipe,Reinforcement,Reinvasion,Relative Density,Remote Terminal Unit,Remote Terminal Unit-Multiplexer,Remote Test Unit,Replant,Restoration,Retaining Wall,Revegetation,Right,Road,Road Traffic Management And Penalty Act,Roadbed,Roadside,Roadside Cleanliness,Roadway,Rock Quality Index,Root Pruning,Route Guidance Sign,Route Time Sign,Scale Or Slope,Schedule Of Unit Prices,Section,Security Monitor Camera,Security Sensor & Light,Seed,Seed Bank,Self-Compacting Concrete,Service Area Customers Service Line,Shaft,Shear Box Stopper,Shear Key,Shear Stud,Sheet,Shop Drawing,Shrub,Sidewalk,Signal Attention Sign,Single Mode Optical Fiber,Site,Site Work,Size,Slope Stablization,Soil,Soil Ball,Soluble Fertilizer,Sow,Special Provisions,Specie,Speed Limits,Speeding,Spiral Deflection Angle,Spiral Tangent Offset,Spread Footing,Stabilization,Staking,Standard,Station,Station,Steel Box,Steel Sheet Pile,Steel-Pile,Stirrup,Structures,Sub-Base,Subcontractor,Sub-Grade,Superelevation,Surfacing,Surveillance Work Station ,Survey,Symmetry,Synchronization Supply Unit,System Alarm,System Field Test,System Interchange,System Printer,Systemic Pesticide,Tack Coat,Tangent Length (Circular Curve),Technical Provisions,Teletype,Temporary Works,Tendon,The Exit Sign Of Indirect Indication,Thin,Tolerance,Toll Collection Efficiency,Toll Station,Tolling Accuracy Rate,Top And Bottom,Top Dressing,Top Face,Top Surface Of Sub-Grade,Topsoil,Towing Service,Traffic Information Server,Traffic Lane,Traffic Relieving Measures,Traffic Sign Board,Transplant,Travel Time Sign,Traveled Way,Turning Point,Typical,Underpassing (Railway), Undercrossing,Utility,Variety,Vary,Vegatation Engineering,Vegetation,Vehicle Detector,Vehicle Image Closed Circuit Television,Ventilation System (Facility),Verification And Validation,Vertical,Video & Data,Video Multiplexer,Video Switcher,Video Tape Recorder,Visibility Indicator,Wall-Mount Add Drop Multiplexer,Water Depth,Wavelength Division Multiplexer,Web,Weed,Weigh Station Communication Controller,Weigh Station Work Station,Weight,Width,Width,Wind Wall,Work Station Server,Working Drawing,Works,Wrap,橋台,加速車道,連絡道,接取交換路由器,事故嚴重性 ,事故傷亡 ,肇事率,易肇事地點 ,促進民間參與公共建設,塞取式多工機,補充說明,支撐先進工法,粒料,前面,空氣污染,空氣監測系統,系統警報器,全套管基樁,交錯(排列),代用材料,鋁,美國州公路及運輸官員協會,美國材料試驗學會,美國銲接學會,及,抗蒸散劑,便道,近似值,約,喬木,拱橋,地瀝青,瀝青混凝土,自動車牌辨識器,輔助車道,平均數,方位角,後面,資料備存裝置,場鑄懸臂工法,基肥,底層,支承,方向角,支承,草花,豎曲線起點,始點,橋之起點,水準點,先行使用,最優申請人,膠結料,瀝青,瀝青處理底層,鑽孔,借土,底部,橋梁,橋面板,橋梁長度,橋面寬,建築設備門禁、溫濕度、火警等感測器,鋼纜(吊索),纜線架,斜張橋,井式基礎,加州載重比值,CBR值,帽梁,集水井,閉路電視中央控制器,水泥砂漿,水泥處理底層,中心距,中心線,圓心角,中線車道,資訊可變標誌,速限可變標誌,頻道庫,規費法,化學摻料,化學藥劑,中華民國國家標準,淨空,爬坡道,閉路電視編碼/解碼器,閉路電視細覽監視器,閉路電視監視器,閉路電視監視器牆,閉路電視工作站,連絡道路/連絡道,集散道,集散道路,混凝土,混凝土砌卵石,施工設備,消費者資訊,容器,契約,契約變更通知,契約工作項目,契約總價,契約單價,收縮縫,承包商,病蟲害防治,核心交換路由器,聯絡隧道,交叉路,栽植,涵洞,危險物品,通訊集訊器,基準線,按日計酬,減速車道,偏角,解調設備,密級配瀝青混凝土,繞行道,通訊處理單板電腦模組,直徑,內直徑,差距,排水,系統數位時鐘,數位用戶載波機,數位錄放影機,稀釋,磁碟機,排水,排水設施,圖,契約圖說,DS1 數位配線盤,DS3 數位配線盤,E1 多工機,E1 光終端通訊設備,每個,每,每面,雙向,東方位,生態綠化,邊線交點,路面邊緣,電子收費,電子收費系統,電子收費暨交通管理,電/光轉換器,高程,路堤,緊急電話機,緊急電話測試機,豎曲線終點,端牆,工程司,工程司之代表,相等,等距,侵蝕控制;沖刷控制,電子收費利用率,香澤蘭,現有,膨脹,擴展,伸縮縫,快速公路,快速公路,矢距,脊背僑,遠側,施肥,肥料,光纖配線盤,農路,農路,濾波器,完成,翼板,特種閃光黃燈,霧(風或雨)慢行警示標誌,霧區閃光黃燈,高速公路及快速公路交通管制規則,高速公路通行費,親和性指示標誌,全超高,完全整合式監控工作站,鍍鋅,鍍鋅鐵管,收費門架,加油站顧客服務專線,一般條款,地理資訊系統,發芽率,GPS 時脈產生器 ,立體交叉,縱坡度,坡度差,綠地,地被,地面線,棲地破碎化,施工道路,高度,草本植物,殺草劑,高乘載車輛,高拉力預力鋼鉸線,高水位,公路,公路法,水平,主電腦,主電腦控制台,雪山隧道,集線器,影像複印機,影像式事件偵測器,影像處理器,不透水層,節塊推進工法,自主查核驗證,內側車道,中內車道,內徑,內面,內層,監工人員,智慧型運輸系統,中耕,入侵性的,仰拱高程,灌溉,接縫,匯流井,接線盒,鍵盤,路況查詢電腦,人工,網路監控工作站,區域網路交換器,景觀,坍方(滑落),車道管制號誌,食草植物,鉛心橡膠支承墊,低強度混凝土底層,左方,長度,圓曲線長度,緩和曲線長,豎曲線長度,銀合歡,每公尺,液晶電視,壤土,地區性道路,長切線(緩和曲線),環道,一式計價,總數,主線柵欄式,總配線架,主隧道,養護,維護工作站,桂竹,人孔,服務區全彩顯示幕,材料,局供材料,最大值,中央分隔帶、中間島,中央分隔帶,中央分離帶進水井,公噸,微型樁,豎曲線中距,小花蔓澤蘭,最小值,數據機,調變設備,監視器控制器,逐跨場鑄工法,割草,覆蓋,多車道自由車流,多重橋接器,多功能中央控制電腦,多功能中央控制電腦控制台,多模光纜,多重網路橋接路由器,多工機,原生植物,天然植生,近側,蜜源植物,網路管理單元,網路管理工作站,標準路冠,北方位,非本工程範圍,未按比例,鐵絲號數,下匝道,車上設備單元,上匝道,開放級配瀝青混凝土,開放路肩,光纖芯線切換器,光時域反射器,光/電轉換器,同等品,有機質,原地面線,中外車道,外徑,外側車道,跨越道,主辦機關/業主,克羅梭曲線參數,舖面,路面,路面標記(反光路面標鈕),路面結構,定植,永久性工程,透水層,農藥,橋墩,樁柱式,樁帽,樁基礎,導坑,無筋混凝土,病害,蟲害,塑性指數,鈑,圓曲線轉入緩和曲線之點,緩和曲線轉入圓曲線之點,緩和曲線轉入直線之點, ,直線轉入緩和曲線之點,複曲線點,切線交點,反曲點,豎曲線切線交點,警勤工作站,盤式支承,預鑄預力混凝土I型梁,預鑄節塊工法 ,預力混凝土,預力混凝土箱型梁,預力樁,透層,網路印表機,數位電子交換機,處理過程,縱坡基點,縱坡線,縱坡基線設計高程控制線,投影伺服器,修剪,播音系統,曲率半徑,雨量偵測器,匝道儀控,快速生態評估法,入侵紅火蟻,公路通行費徵收管理辦法 ,鋼筋混凝土,鋼筋混凝土箱涵,鋼筋混凝土管,鋼筋,再次入侵,相對密度,遠方終接器,遠方終接通訊彙集器,遠端監測單元,補植,復育,擋土牆,植生復育,右方,道路,道路交通管理處罰條例,路床,路旁,路容清潔,路幅,岩體指數,斷根,路徑導引標誌,路徑比較旅行時間標誌,比例或坡度,詳細價目表,段, 斷面,機房交控設備監視攝影機,門禁人體感知器及照明燈,種子,種子庫,自充填混凝土,服務區顧客服務專線,豎井,剪力鋼箱,剪力榫,剪力釘,張,施工製造圖,灌木,人行道,注意號誌標誌板,單模光纜,工地,工地作業,規格,邊坡穩定,土壤,土球,水溶性肥料,播種,特訂條款,種,速限,超速 ,緩和曲線偏角,緩和曲線切線之支距,直接基礎,穩定處理,立支架,標準,里程或樁號,樁號,鋼箱型梁,鋼板樁,鋼管樁,箍筋,構造物或稱結構物,基層,分包商,路基,超高,面層,設備監視工作站,測量,對稱,同步訊號供應器,可程式系統警報裝置,系統功能實測,系統交流道,系統印表機,系統性農藥,粘層,切線長(圓曲線),施工技術規範,電傳打字設備,臨時工程,鋼腱 ,間接通達出口預告標誌,疏枝 ,容許誤差,收費效率,收費站,可收費成功率,頂層及底層,追肥,頂面,路基頂面,表土,拖救服務,線上交通資訊伺服器,車道,交通疏導措施,標誌牌,移植,旅行時間標誌,行車道,轉點,典型,穿越道,公共設施,品種,變化,植生工程,植生,車輛偵測器,車牌辨識攝影機,通風系統(設施),查核驗證,垂直,視頻及數據,視訊多工機,視訊開關,錄放影機,濃霧偵測器,壁掛式塞取式多工機,水深,多波多工器,腹板,雜草,地磅通訊控制器,地磅查詢工作站,重量,寬度,幅寬,翼牆,工作站伺服器,工作圖,工程或工作,包紮
選單
搜尋
進階搜尋
您的瀏覽器不支援javascript 之Google 搜尋
Abutment,Accelerating Lane,Access Road,Access Switch Router,Accident Severity,Accident Casualty,Accident Rate,Accident-Prone Location,Act For Promotion Of Private Participation In Infrastructure Projects,Add Drop Multiplexer ,Addenda,Advancing Shoring Method,Aggregate,Ahead,Air Pollution,Air Pollution Monitor,Alarm Controller,All Casing Drill Piles,Alternate,Alternative Plant Material,Aluminium,American Association Of State Highway And Transportation Officials,American Society For Testing And Materials,American Welding Society,And,Antitranspirant,Approach Road,Approximate,Arbor,Arch Bridge,Asphalt,Asphalt Concrete,Automatic Vehicle Identification,Auxiliary Lane,Average,Azimuth,Back,Back Up,Balanced Cantilever Method,Basal Dressing,Base,Bearing,Bearing,Bedding Plant,Begin Of Vertical Curve,Beginning,Beginning Of Bridge,Bench Mark,Beneficial Occupancy,Best Applicant,Binder,Bitumen(Asphalt),Bituminous Treated Base,Boring Hole,Borrow,Bottom,Bridge,Bridge Deck,Bridge Length,Bridge Roadway Width,Building Sensor,Cable,Cable Tray,Cable-Stayed Bridge,Caisson Foundation,California Bearing Ratio,California Bearing Ratio Value,Cap Beam,Catch Basin,Cctv Central Controller,Cement Mortar,Cement-Treated Base,Center To Center,Centerline,Central Angle,Central Lane,Changeable Message Sign,Changeable Speed Limit Sign,Channel Bank,Charges And Fees Act,Chemical Admixture,Chemicals,Chinese National Standards,Clearance,Climbing Lane,Closed Circuit Television Coder/Decoder,Closed Circuit Television Detail Monitor,Closed Circuit Television Monitor,Closed Circuit Television Monitor Wall,Closed Circuit Television Work Station,Collector Road/Access Road,Collector-Distributor Road,Collector-Distributor Road,Concrete,Concrete Grouted Rock,Constructional Equipment,Consumers Information,Container,Contract,Contract Change Order,Contract Item; Pay Item,Contract Total Cost,Contract Unit Price,Contraction Joint,Contractor,Control Of Disease And Pest,Core Switch Router,Cross Connection,Cross Road,Cultivation,Culvert,Dangerous Goods,Data Gathering Processor,Datum Line,Day Work,Decelerating Lane,Deflection Angle,Demodulator,Dense Grade Asphalt Concrete,Detour,Dgp-Multiplexer,Diameter,Diameter (Inside),Difference, Drainage,Digital Clock,Digital Loop Carrier,Digital Video Recorder,Dilution,Disk,Drainage,Drainage Facilities,Drawing,Drawings; Contract Drawings,Ds1 Digital Distribution Pannel,Ds3 Digital Distribution Pannel,E1 Multiplexer,E1 Optical Line Terminal Equipment,Each,Each,Each Face,Each Way,East Coordinate,Ecological Revegetation,Edge Meet,Edge Of Pavement,Electronic Toll Collection,Electronic Toll Collection,Electronic Toll Collection And Transportation Management,Electronic/Optical Converter,Elevation,Embankment,Emergency Telephone,Emergency Telephone Test Unit,End Of Vertical Curve,End Wall,Engineer,Engineer''S Representative,Equal,Equal Space,Erosion Control,Etc Utilization Rate,Eupatorium Odoratum,Existing,Expansion,Expansion Joint,Expressway,Expressway,External Distance From Pi To Center Of Circular Curve Arc,Extradosed Bridge,Far Face,Fertilization,Fertilizer,Fiber Distribution Panel,Field Path,Field Path,Filter,Finished,Flange,Flashing Amber,Fog Sign,Fog Warning Light,Freeway And Expressway Traffic Regulation,Freeway Toll ,Friendly Guide Sign,Full Superelevation,Fully Integrated Work Station,Galvanized,Galvanized Iron Pipe,Gantry,Gas Station Customers Service Line,General Provisions,Geographic Information System,Germination Rate,Gps Clock Generator,Grade Separation,Grade, Grade Difference,Greenery Land,Ground Cover,Ground Line,Habitat Fragmentation,Haul Road,Height,Herb,Herbicides,High Occupancy Vehicle,High Tensile Strand,High Water Level,Highway,Highway Act ,Horizontal,Host Computer,Host Computer Console,Hsuehshan Tunnel ,Hub,Image Copy Machine,Image Incident Detector,Image Processor,Impervious Layer,Incremental Launching Method,Independent Verification And Validation,Inner Lane,Inner-Central Lane,Inside Diameter,Inside Face,Inside Layer,Inspector,Intelligent Transportation System,Intertillage,Invasive,Invert Elevation,Irrigation,Joint,Junction Box,Keyboard,Kiosk Query Computer,Labor,Lan Management Work Station,Lan Switch,Landscape,Landslip,Lane Control Signal,Larval Food Plant,Lead Rubber Bearing,Lean Concrete Base Course,Left,Length,Length Of Circular Curve,Length Of Spiral,Length Of Vertical Curve,Leucaena Leucocephala,Linear Meter,Liquid Crystal Display Television,Loam,Local Road,Long Tangent (Spiral),Loop,Lump Sum,Lump Sum,Main Line Barrier Type ,Main Distribution Frame,Main Tunnel,Maintenance,Maintenance Work Station,Makino''S Bamboo,Manhole,Map Display,Materials,Materials Supplied By Owner,Maximum,Median,Median,Median Inlet,Metric Ton,Micro-Pile,Middle Ordinate Of Vertical Curve,Mikania Micrantha,Minimum,Modem,Modulator,Monitor Control Panel,Movable Scaffolding System,Mowing,Mulch,Multi Lane Free Flow,Multi-Bridge,Multi-Function Control Computer,Multi-Function Control Computer Console,Multi-Mode Optical Fiber,Multiple Network Bridge Router,Multiplexer,Native Plant,Natural Vegetation,Near Face,Nectar Plant,Network Management Unit,Network Management Work Station,Normal Crown,North Coordinate,Not In Contract,Not To Scale,Number Of Iron Wire,Off-Ramp,On Board Unit,On-Ramp,Open Graded Asphalt Concrete,Opening Of Road Shoulders,Optical Switch,Optical Time Domain Reflectometry,Optical/Electronic Converter,Or Equal,Organic Matter,Original Ground Line,Outer-Central Lane,Outside Diameter,Outside Lane,Overcrossing,Owner Or Employer,Parameter Of Clothoid,Pavement,Pavement,Pavement Marker (Reflectorized),Pavement Structure,Permanent Plant,Permanent Works,Pervious Layer,Pesticide,Pier,Pile Bent,Pile Cap,Pile Foundation,Pilot Tunnel,Plain Cement Concrete,Plant Disease,Plant Pest,Plasticity Index,Plate,Point Of Change From Circular Curve To Spiral,Point Of Change From Spiral To Circular Curve,Point Of Change From Spiral To Tangent , Short Tangent (Spiral),Point Of Change From Tangent To Spiral,Point Of Compound Curve,Point Of Intersection Of Tangents,Point Of Reversed Curve,Point Of Vertical Intersection,Police Station Computer,Pot Bearing,Precast And Prestressed Concrete I Girder,Precast Segmental Method ,Prestressed Concrete,Prestressed Concrete Box,Prestressed Concrete Pile,Prime Coat,Printer & Printer Server,Private Automatic Branch Exchange,Processing,Profile Grade,Profile Grade Line,Profile Grade Line,Project Server,Prune,Public Address System,Radius Of Curvature,Rain Detector,Ramp Metering,Rapid Ecological Assessment,Red Imported Fire Ant(Rifa),Regulations Governing Collection Of Highway Tolls,Reinforced Concrete,Reinforced Concrete Box,Reinforced Concrete Pipe,Reinforcement,Reinvasion,Relative Density,Remote Terminal Unit,Remote Terminal Unit-Multiplexer,Remote Test Unit,Replant,Restoration,Retaining Wall,Revegetation,Right,Road,Road Traffic Management And Penalty Act,Roadbed,Roadside,Roadside Cleanliness,Roadway,Rock Quality Index,Root Pruning,Route Guidance Sign,Route Time Sign,Scale Or Slope,Schedule Of Unit Prices,Section,Security Monitor Camera,Security Sensor & Light,Seed,Seed Bank,Self-Compacting Concrete,Service Area Customers Service Line,Shaft,Shear Box Stopper,Shear Key,Shear Stud,Sheet,Shop Drawing,Shrub,Sidewalk,Signal Attention Sign,Single Mode Optical Fiber,Site,Site Work,Size,Slope Stablization,Soil,Soil Ball,Soluble Fertilizer,Sow,Special Provisions,Specie,Speed Limits,Speeding,Spiral Deflection Angle,Spiral Tangent Offset,Spread Footing,Stabilization,Staking,Standard,Station,Station,Steel Box,Steel Sheet Pile,Steel-Pile,Stirrup,Structures,Sub-Base,Subcontractor,Sub-Grade,Superelevation,Surfacing,Surveillance Work Station ,Survey,Symmetry,Synchronization Supply Unit,System Alarm,System Field Test,System Interchange,System Printer,Systemic Pesticide,Tack Coat,Tangent Length (Circular Curve),Technical Provisions,Teletype,Temporary Works,Tendon,The Exit Sign Of Indirect Indication,Thin,Tolerance,Toll Collection Efficiency,Toll Station,Tolling Accuracy Rate,Top And Bottom,Top Dressing,Top Face,Top Surface Of Sub-Grade,Topsoil,Towing Service,Traffic Information Server,Traffic Lane,Traffic Relieving Measures,Traffic Sign Board,Transplant,Travel Time Sign,Traveled Way,Turning Point,Typical,Underpassing (Railway), Undercrossing,Utility,Variety,Vary,Vegatation Engineering,Vegetation,Vehicle Detector,Vehicle Image Closed Circuit Television,Ventilation System (Facility),Verification And Validation,Vertical,Video & Data,Video Multiplexer,Video Switcher,Video Tape Recorder,Visibility Indicator,Wall-Mount Add Drop Multiplexer,Water Depth,Wavelength Division Multiplexer,Web,Weed,Weigh Station Communication Controller,Weigh Station Work Station,Weight,Width,Width,Wind Wall,Work Station Server,Working Drawing,Works,Wrap,橋台,加速車道,連絡道,接取交換路由器,事故嚴重性 ,事故傷亡 ,肇事率,易肇事地點 ,促進民間參與公共建設,塞取式多工機,補充說明,支撐先進工法,粒料,前面,空氣污染,空氣監測系統,系統警報器,全套管基樁,交錯(排列),代用材料,鋁,美國州公路及運輸官員協會,美國材料試驗學會,美國銲接學會,及,抗蒸散劑,便道,近似值,約,喬木,拱橋,地瀝青,瀝青混凝土,自動車牌辨識器,輔助車道,平均數,方位角,後面,資料備存裝置,場鑄懸臂工法,基肥,底層,支承,方向角,支承,草花,豎曲線起點,始點,橋之起點,水準點,先行使用,最優申請人,膠結料,瀝青,瀝青處理底層,鑽孔,借土,底部,橋梁,橋面板,橋梁長度,橋面寬,建築設備門禁、溫濕度、火警等感測器,鋼纜(吊索),纜線架,斜張橋,井式基礎,加州載重比值,CBR值,帽梁,集水井,閉路電視中央控制器,水泥砂漿,水泥處理底層,中心距,中心線,圓心角,中線車道,資訊可變標誌,速限可變標誌,頻道庫,規費法,化學摻料,化學藥劑,中華民國國家標準,淨空,爬坡道,閉路電視編碼/解碼器,閉路電視細覽監視器,閉路電視監視器,閉路電視監視器牆,閉路電視工作站,連絡道路/連絡道,集散道,集散道路,混凝土,混凝土砌卵石,施工設備,消費者資訊,容器,契約,契約變更通知,契約工作項目,契約總價,契約單價,收縮縫,承包商,病蟲害防治,核心交換路由器,聯絡隧道,交叉路,栽植,涵洞,危險物品,通訊集訊器,基準線,按日計酬,減速車道,偏角,解調設備,密級配瀝青混凝土,繞行道,通訊處理單板電腦模組,直徑,內直徑,差距,排水,系統數位時鐘,數位用戶載波機,數位錄放影機,稀釋,磁碟機,排水,排水設施,圖,契約圖說,DS1 數位配線盤,DS3 數位配線盤,E1 多工機,E1 光終端通訊設備,每個,每,每面,雙向,東方位,生態綠化,邊線交點,路面邊緣,電子收費,電子收費系統,電子收費暨交通管理,電/光轉換器,高程,路堤,緊急電話機,緊急電話測試機,豎曲線終點,端牆,工程司,工程司之代表,相等,等距,侵蝕控制;沖刷控制,電子收費利用率,香澤蘭,現有,膨脹,擴展,伸縮縫,快速公路,快速公路,矢距,脊背僑,遠側,施肥,肥料,光纖配線盤,農路,農路,濾波器,完成,翼板,特種閃光黃燈,霧(風或雨)慢行警示標誌,霧區閃光黃燈,高速公路及快速公路交通管制規則,高速公路通行費,親和性指示標誌,全超高,完全整合式監控工作站,鍍鋅,鍍鋅鐵管,收費門架,加油站顧客服務專線,一般條款,地理資訊系統,發芽率,GPS 時脈產生器 ,立體交叉,縱坡度,坡度差,綠地,地被,地面線,棲地破碎化,施工道路,高度,草本植物,殺草劑,高乘載車輛,高拉力預力鋼鉸線,高水位,公路,公路法,水平,主電腦,主電腦控制台,雪山隧道,集線器,影像複印機,影像式事件偵測器,影像處理器,不透水層,節塊推進工法,自主查核驗證,內側車道,中內車道,內徑,內面,內層,監工人員,智慧型運輸系統,中耕,入侵性的,仰拱高程,灌溉,接縫,匯流井,接線盒,鍵盤,路況查詢電腦,人工,網路監控工作站,區域網路交換器,景觀,坍方(滑落),車道管制號誌,食草植物,鉛心橡膠支承墊,低強度混凝土底層,左方,長度,圓曲線長度,緩和曲線長,豎曲線長度,銀合歡,每公尺,液晶電視,壤土,地區性道路,長切線(緩和曲線),環道,一式計價,總數,主線柵欄式,總配線架,主隧道,養護,維護工作站,桂竹,人孔,服務區全彩顯示幕,材料,局供材料,最大值,中央分隔帶、中間島,中央分隔帶,中央分離帶進水井,公噸,微型樁,豎曲線中距,小花蔓澤蘭,最小值,數據機,調變設備,監視器控制器,逐跨場鑄工法,割草,覆蓋,多車道自由車流,多重橋接器,多功能中央控制電腦,多功能中央控制電腦控制台,多模光纜,多重網路橋接路由器,多工機,原生植物,天然植生,近側,蜜源植物,網路管理單元,網路管理工作站,標準路冠,北方位,非本工程範圍,未按比例,鐵絲號數,下匝道,車上設備單元,上匝道,開放級配瀝青混凝土,開放路肩,光纖芯線切換器,光時域反射器,光/電轉換器,同等品,有機質,原地面線,中外車道,外徑,外側車道,跨越道,主辦機關/業主,克羅梭曲線參數,舖面,路面,路面標記(反光路面標鈕),路面結構,定植,永久性工程,透水層,農藥,橋墩,樁柱式,樁帽,樁基礎,導坑,無筋混凝土,病害,蟲害,塑性指數,鈑,圓曲線轉入緩和曲線之點,緩和曲線轉入圓曲線之點,緩和曲線轉入直線之點, ,直線轉入緩和曲線之點,複曲線點,切線交點,反曲點,豎曲線切線交點,警勤工作站,盤式支承,預鑄預力混凝土I型梁,預鑄節塊工法 ,預力混凝土,預力混凝土箱型梁,預力樁,透層,網路印表機,數位電子交換機,處理過程,縱坡基點,縱坡線,縱坡基線設計高程控制線,投影伺服器,修剪,播音系統,曲率半徑,雨量偵測器,匝道儀控,快速生態評估法,入侵紅火蟻,公路通行費徵收管理辦法 ,鋼筋混凝土,鋼筋混凝土箱涵,鋼筋混凝土管,鋼筋,再次入侵,相對密度,遠方終接器,遠方終接通訊彙集器,遠端監測單元,補植,復育,擋土牆,植生復育,右方,道路,道路交通管理處罰條例,路床,路旁,路容清潔,路幅,岩體指數,斷根,路徑導引標誌,路徑比較旅行時間標誌,比例或坡度,詳細價目表,段, 斷面,機房交控設備監視攝影機,門禁人體感知器及照明燈,種子,種子庫,自充填混凝土,服務區顧客服務專線,豎井,剪力鋼箱,剪力榫,剪力釘,張,施工製造圖,灌木,人行道,注意號誌標誌板,單模光纜,工地,工地作業,規格,邊坡穩定,土壤,土球,水溶性肥料,播種,特訂條款,種,速限,超速 ,緩和曲線偏角,緩和曲線切線之支距,直接基礎,穩定處理,立支架,標準,里程或樁號,樁號,鋼箱型梁,鋼板樁,鋼管樁,箍筋,構造物或稱結構物,基層,分包商,路基,超高,面層,設備監視工作站,測量,對稱,同步訊號供應器,可程式系統警報裝置,系統功能實測,系統交流道,系統印表機,系統性農藥,粘層,切線長(圓曲線),施工技術規範,電傳打字設備,臨時工程,鋼腱 ,間接通達出口預告標誌,疏枝 ,容許誤差,收費效率,收費站,可收費成功率,頂層及底層,追肥,頂面,路基頂面,表土,拖救服務,線上交通資訊伺服器,車道,交通疏導措施,標誌牌,移植,旅行時間標誌,行車道,轉點,典型,穿越道,公共設施,品種,變化,植生工程,植生,車輛偵測器,車牌辨識攝影機,通風系統(設施),查核驗證,垂直,視頻及數據,視訊多工機,視訊開關,錄放影機,濃霧偵測器,壁掛式塞取式多工機,水深,多波多工器,腹板,雜草,地磅通訊控制器,地磅查詢工作站,重量,寬度,幅寬,翼牆,工作站伺服器,工作圖,工程或工作,包紮
本局資訊
基本資訊
本局簡介
局長簡介
歷任首長
組織與職掌
單位介紹
政府資訊公開專區
個人資料保護公告事項
政府公開資訊
營運資訊
施政計畫
廉政專區
廉政平臺
廉政專線
廉政政策
廉政會報
廉政宣導
廉政倫理
財產申報
利益迴避
廉政法規
廉政剪影
網站連結
檔案應用專區
法規查詢
交通管理
收費法規
建築管理
災害防救
用地
行政法規
人事法規
廉政法規
卓越專區
國際級
院級
部級
本局
出版刊物
出版品
國道視窗
作業規定/展售處
GPI政府出版品資訊網(另開新視窗)
歷史專區
國道新建工程局歷史專頁
拓建處歷史專區
口述歷史
國道人工收費
消息公告
最新消息
新聞稿
道路封閉資訊
活動快遞
公告/公文附件
公告/公布欄
公文附件下載(另開新視窗)
招標資訊
國道即時路況(另開新視窗)
行車指南
國道地圖
道路通車訊息
路網示意圖
國道替代道路圖
交流道、服務區里程一覽表
隧道里程查詢
爬坡道里程查詢
地磅站里程查詢
避車彎里程查詢
限高門架查詢
交通管理措施
交通工程資訊
交通工程手冊
交通工程標準圖
認識國道標誌
認識國道路面反光標記
施工相關規定
環境設施英譯專區
交通安全資訊
道路救援資訊
交通法規
國道安全駕駛手冊
宣導專區
高速公路宣導短片
高速公路平面文宣
112年道安宣導
特殊車輛管制資訊
交通控制簡介
智慧化運輸系統ITS專區
智慧型運輸系統ITS簡介
高快速公路智慧化
旅行時間資訊
宣導資料
國道工程
國道養護
道路養護
路容景觀
新建及拓建工程
工程計畫
在建工程
路產管理
建築管理
授權核定建管範圍
法規適用及常見缺失態樣
建築執照申請書表
開工申報
施工勘驗申報
建築物室內裝修管理
建築物公共安全申報
建築物無障礙專區
工程技術
價值工程資訊
技術交流
橋梁耐震補強
收費暨服務區
國道電子計程收費主題網
服務區資訊
服務區主題網
服務區、加油站及充電樁簡介
服務區訊息
招商資訊
櫃位介紹
失物招領公告
太陽能光電設施
今日通行費率
便民服務
局長信箱
客服專線
人民申請案件專區
消費者資訊
政府資料開放
雪隧文物館、收費站文物陳列室線上申請參訪
雪山隧道文物館
泰山站文物陳列室
大甲站文物陳列室
田寮站文物陳列室
國道施工車輛證線上申請
常見問答
電子收費
回數票回收
施工維護及管理
拓(新)建工程
交通管理
路權與財產管理
國賠案件
廣播電台民眾CALL IN回復
檔案下載
雙語詞彙
相關網站
為民服務專區
主題宣導
交通管理
大型重機行駛國道與快速公路檢核專區
113年國道智慧交通管理創意競賽
國道連續假期交通疏運專區
災害應變之配合措施
雪山隧道宣導網頁
國道交通改善成果專區
橋梁工程
高速公路橋梁耐震補強
永續發展環境復育
生態工法
環境影響評估
生態復育
國道讓蝶道
生態檢核相關資訊專區(聯絡人莊益賓分機2165)
發現國道
數位策展
噶瑪蘭傳奇-國道5號主題展
回憶2340-國道收費演進主題展
進化交通新時代-智慧運輸系統主題展
你所不知的金門大橋
國道工程用地取得演進—傾聽民意成就雙贏
性別平等專區
本局性別平等工作小組
性騷擾防治
推動性別平等計畫及成果分享
性平文宣
性別統計
性平教材
性平相關法令
性平相關網頁連結
職業安全衛生專區
其它類別
高速公路兩側違規樹立廣告物
建築物昇降設備、機械停車設備安全管理機制
各國道周邊工程狀況清查表
:::
»
高速公路局中文版
»
本局資訊
»
政府資訊公開專區
»
政府公開資訊
»
委託研究報告
委託研究報告
查詢
清除
名稱
年度
摘要
主辦單位
檔案下載
景觀道路相關設施設計及施工參考手冊研訂
92年
景觀道路是具景觀資源的線型路徑,可提供遊客欣賞停留的機會,以增加行車愉悅感。由於...
工務組
全部下載
高速公路鄰近都會區綠地多元化利用之可行性評估
91年
台灣地區累積多年來的經建發展成果,自用車已成為國人主要的運輸工具,四通八達的公路...
工務組
全部下載
公路鋼結構橋梁之檢測及補強規範研究計畫
92年
台灣因位居颱風的正衝,也是地震頻繁地帶,所以橋梁常遭受地震、洪水、土石流等災害之...
工務組
全部下載
高速公路橋梁延壽評估及案例分析委託研究計畫
93年
橋梁系統為國家建設的重點,影響整體經濟之發展,扮演貨物暢通樞紐的重要角色。橋梁主...
工務組
全部下載
國道3號濁水溪橋沖刷監測之研究
98年~99年
本計畫其旨為針對臺灣地區橋梁因河川既短且陡之特性,易因河川運補砂量不足時造成河床...
規劃組(原技術組)
全部下載
經北宜運輸走廊至宜蘭地區旅次之起迄特性研究
98年~99年
為了紓解國道5號至宜蘭地區交通擁擠現象,高速公路局著手採用若干交通管制手...
交通管理組
全部下載
高速公路旅行時間預測模式之開發與調查分析
99年~101年
本計畫係針對高速公路路段,利用先進之運輸、通訊與資訊等科技,蒐集與處理各項交通資...
交通管理組
全部下載
高速公路中長程旅行時間預測模式之建立與應用
101年~102年
臺灣西部走廊的高快速公路路網已漸趨嚴密,用路人可依據個人需求選擇多種...
交通管理組
全部下載
營運階段國道永續發展環境復育改善研究計畫
97年~100年
交通部臺灣區國道高速公路局(以下簡稱高公局)為瞭解國道設施與景觀綠化對沿線生態環...
工務組
全部下載
高速公路噪音潛勢分析與防制措施之研究
98年~99年
噪音管制法於72年5月13日公布施行,其間...
規劃組(原技術組)
全部下載
楊梅至新竹地區運輸系統瓶頸及因應對策探討
100年~101年
本計畫係依據交通部100年1月日第1441次部務會報紀錄結論4.「為改善新竹(科...
規劃組(原技術組)
全部下載
國道1號汐止收費站至汐五高架(汐止端)交通改善規劃暨工程可行性研究
100年~102年
國道1號為臺北都會區東側路廊進出市中心重要運輸孔道,然因缺乏主要地區道路銜接臺北...
規劃組(原技術組)
全部下載
國道邊坡工程專業技術服務
101年~102年
民國99年4月25日國道3號3.1k邊坡發生坍滑事件後,交通部臺灣區國道高速...
工務組
全部下載
國道邊坡管理系統監測管理系統平台建置
99年~99年
交通部臺灣區國道高速公路局(以下簡稱高公局)主司我國國道高速公路之經營管理與...
工務組
全部下載
國道邊坡全生命週期維護管理技術研究暨系統擴增開發
100年~102年
交通部臺灣區國道高速公路局(以下簡稱高公局)主要任務為執行我國國道高速公路之...
工務組
全部下載
1
2
3
4
下一頁
到
頁碼
第1頁
第2頁
第3頁
第4頁
確認前往
回首頁
上一頁
回頂端
友善列印
本局資訊
基本資訊
政府資訊公開專區
施政計畫
廉政專區
檔案應用專區
法規查詢
卓越專區
出版刊物
歷史專區
消息公告
最新消息
新聞稿
道路封閉資訊
活動快遞
公告/公文附件
招標資訊
國道即時路況(另開新視窗)
行車指南
國道地圖
交通管理措施
交通工程資訊
交通安全資訊
道路救援資訊
交通法規
國道安全駕駛手冊
宣導專區
特殊車輛管制資訊
交通控制簡介
智慧化運輸系統ITS專區
國道工程
國道養護
新建及拓建工程
路產管理
建築管理
工程技術
收費暨服務區
國道電子計程收費主題網
服務區資訊
今日通行費率
便民服務
局長信箱
客服專線
人民申請案件專區
消費者資訊
政府資料開放
雪隧文物館、收費站文物陳列室線上申請參訪
國道施工車輛證線上申請
常見問答
檔案下載
雙語詞彙
相關網站
為民服務專區
主題宣導
交通管理
橋梁工程
永續發展環境復育
發現國道
數位策展
性別平等專區
職業安全衛生專區
其它類別